TWP Stain Application Tips
- Mix Preservative thoroughly
- Apply TWP by brush, pump sprayer or roller
- Saturate surface with TWP
- If needed, apply second coat wet on wet
- Do not let TWP puddle
- Excessive product that does not penetrate may cause failure
- Overnight dry time depending on temperature and humidity
- Do not thin TWP
- Cleanup with mineral spirits
- Do not apply below 50 degrees F or above 90 degrees F
- Coverage rate: 200-400 sq feet per gallon